Intermittent Bonded Ribbon Production Line Available For Sale
A specified speed of 600 m/min gives this equipment considerable production capacity for optical-fiber applications. Before making purchasing plans, buyers should verify the actual speed, configuration, and operating conditions with the manufacturer.
Shanghai Weiye OFC supplies equipment designed specifically for producing rollable ribbons containing 12 or 16 fibers. The published product information covers capabilities, technical details, and supplied systems, helping U.S. buyers begin evaluating the equipment against their manufacturing needs.
Review the listed configuration in the product description, then contact the supplier about pricing, installation, and options specific to your project. Doing so can clarify which specifications and options are relevant to your facility and production objectives.
The listed address for Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. is 201 Minyi Road, Songjiang District, Shanghai. Use the product page for initial reference and verify current technical and commercial information directly with the company. Submitting a clear request for pricing and specifications can help you move forward with the assessment.
Fiber Cable Sheathing Line Fiber Draw Tower Fiber Draw Tower
Key Takeaways
- A speed of 600 m/min is listed, but buyers should verify the operating conditions with the manufacturer.
- This equipment supports production of 12-fiber and 16-fiber rollable ribbon formats.
- Information about equipment functions, specifications, and included systems appears on the product page.
- Ask the supplier to clarify costs, installation arrangements, and requirements unique to your project.
- A company address in Shanghai’s Songjiang District is included in the supplier information.
Intermittent Bonded Ribbon Production Line Overview
According to the supplier, the equipment is designed for rollable IBR configurations containing 12 or 16 fibers. Its product page specifies a construction speed of 600 m/min and a fiber diameter of Ф245 μm ±10 μm. As these are manufacturer-listed values, confirm the actual production speed and relevant operating requirements directly with the supplier.
Intermittent Bonded Ribbon Production Line
Equipment Designed For Twelve- And Sixteen-Fiber Rollable Ribbon Production
Two fiber-count options are supported by the configuration for manufacturing rollable ribbons. Buyers can use these options as a starting point for checking compatibility with target formats, fiber sizes, and handling requirements.
How Intermittent Bonding Supports Flexible Fiber Arrangement
The patent’s design examples describe neighboring fiber subunits joined by adhesive bonds positioned at intervals. One illustrated spacing range extends from 10 mm to 1,000 mm. This differs from a continuously bonded structure in which the connection extends across the full ribbon length.
These intermittent adhesive connections allow the assembly to change from a relatively flat configuration into rolled, curled, or folded forms. The specified spacing illustrates the patented design concept rather than confirmed production-machine settings.
- Machine details: A choice of 12 or 16 fibers, a listed operating speed of 600 m/min, and a specified diameter of Ф245 μm ±10 μm.
- Patent example: Illustrative spacing between adhesive bonds of 10 mm to 1,000 mm.
- Design benefit: Adaptable handling when the ribbon takes different shapes.
Uses In Optical Fiber Cable Manufacturing
Flexible ribbon arrangements can help cable designers balance access for splicing with compact cable packaging. The patented design keeps fibers arranged in order while permitting sections between bonded points to shift as the cable is assembled.
Compact Cable Designs And High Fiber Density
An optical fiber ribbon may remain flat during mass fusion splicing and subsequently fold or roll for installation in a smaller cable. Potential advantages described in the patent include smaller cable constructions and an increased ratio of fiber area to overall cable cross-sectional area. Actual performance and dimensions will vary according to the overall cable design and the application for which it is intended.
Organizing Fiber Ribbons To Support Efficient Fusion Splicing
The ribbon format enables organized handling at the splice location while allowing the subunits to move during cable assembly. The manufacturer’s material-handling specifications identify payoff reel capacities of 25.2 km and 50.4 km of fiber. Buyers can evaluate these capacities against their production requirements and existing handling arrangements.
| Design characteristic | Potential use | Consideration for buyers |
|---|---|---|
| Flat fiber configuration | Mass fusion splicing | Verify the needs of your splicing process |
| Folded or rolled format | Space-efficient cable packaging | Review the overall cable construction |
| Payoff reels with capacities of 25.2 km and 50.4 km | Planning material-handling operations | Align reel capacities with operating needs |
Production Line Specifications And Performance
Before asking for pricing, assess whether the stated machine performance matches the demands of your production process. Installation preparations should also account for suitable reels and the utilities available at the production site.
Speed, Diameter, And Attenuation
According to the specifications, the construction speed reaches 600 m/min. The specified fiber diameter is Ф245 μm ±10 μm, while additional attenuation is stated as ≤0.01 dB/km at 1550 nm. Ask the supplier to verify the testing conditions and achievable results.
Compatibility With Payoff And Take-Up Reels
The payoff system accommodates two reel dimensions, and the maximum weight of a full reel is 10 kg. The take-up assembly supports a T-type reel as well as a fiber-optic reel. Verify that your selected reel configuration is compatible with the facility’s material-handling process.
Site Utilities And Environment
The machine requires a three-phase, five-wire electrical supply rated at 380 V ±10%. Its specified operating environment is enclosed, clean, dry, and protected from drafts, with temperatures of 15 to 25°C and relative humidity no higher than 85%. Nitrogen must be supplied at 7 bar with 99.99% purity, together with compressed air at 6 bar. Check all utility connections in advance of installing the equipment.
| Specification | Listed requirement | Planning note |
|---|---|---|
| Payoff reels | Ф236 × Ф25.4 × 108 mm; Ф267 × Ф25.4 × 180 mm; maximum full-reel weight ≤10 kg | Check reel compatibility and maximum weight |
| Reel used for take-up | T-type reel: Φ410 × Φ50.8 × 391 mm, alternatively a fiber-optic reel | Verify the preferred reel format |
| Electrical and environmental requirements | 380 V ±10%; 15 to 25°C; relative humidity ≤85% | Prepare a dry, clean, draft-free operating area |
| Gas utility supply | Nitrogen at 7 bar and 99.99% purity; compressed air at 6 bar | Check available gas capacity before equipment setup |
Fiber Payoff And Gathering Equipment
Optical fibers are guided toward the forming section by the payoff and gathering components. Their control systems support consistent feeding and help protect individual fibers throughout handling.
Tension-Controlled Payoff System For Sixteen Spools
The active payoff accommodates 16 spools, incorporates traversing, and permits independent tension adjustment. The permitted weight for an individual spool is up to 10 kg. Detailed specifications indicate a tension range of 0.4 to 2 N, accuracy of ±0.02 N, and a 550 W motor. Because a separate overview states 40 to 150 g with ±2 g accuracy, ask the manufacturer to clarify the correct values for your intended setup.
Fiber Guidance, Break Detection, And Static Control
U-groove guides, multi-groove gathering rollers, and anti-jump components channel fibers into the forming section. A break-detection system and alarms notify operators when problems occur. Safe handling is supported by protective guards and a pneumatic clamping mechanism. A rod-type electrostatic dust collector is positioned at the fiber exit, and additional anti-static devices help control dust throughout the gathering path.
| Component | Listed detail | Intended function |
|---|---|---|
| Payoff | 16 spools with a maximum of 10 kg each | Feeds optical fibers with traversing movement |
| Motor and tension system | 0.4 to 2 N with ±0.02 N accuracy; 550 W | Supports regulated payoff of fibers |
| Guidance and safety | Grooved rollers, alarms, guards, and pneumatic clamping | Directs fibers and supports safe handling |
| Electrostatic management | Rod-type dust collector and anti-static equipment | Helps reduce dust near fiber routes |
Precision Molding And Intermittent Adhesive Dispensing
The ribbon-forming platform allows operators to control the mold position and placement of adhesive. These settings allow the production process to be adapted to the intended ribbon configuration.
Ribbon Formation Using An Adjustable IBR Mold Platform
Ribbon formation uses three mold assemblies, each capable of holding up to five Nordson EFD jet valves. The mold adjustment range extends from 0 to 15 mm, while the mold base can be maintained between 20°C and 60°C. Precision valve groups mounted on sliding tables allow fine positioning and accurate application of adhesive dots.
Adjustable Nozzle Configurations For Twelve- And Sixteen-Fiber Ribbon Production
The 12-fiber configuration employs a 5+5+1 valve arrangement. Production of the 16-fiber format uses a 5+5+5 configuration. Operators can adjust adhesive-dot spacing and the number of dots through the interface to match the selected optical fiber ribbon design. The process calls for a specialized adhesive suitable for both coating and curing.
| Setting | 12-Fiber Format | 16-Fiber Format |
|---|---|---|
| Dispensing valve layout | Valve arrangement of 5+5+1 | Valve arrangement of 5+5+5 |
| Mold adjustment | 0 to 15 mm adjustment | 0 to 15 mm adjustment |
| Mold-base temperature | Temperature range of 20°C to 60°C | 20°C to 60°C operating range |
Curing Bonded Fiber Ribbons With UV-LED Technology
Adhesive across the fiber assembly is cured through a sequence of UV exposure stages. The arrangement of the ovens and their published operating values provide buyers with information for evaluating process compatibility.
Initial Pre-Curing And Main Curing Operations
Pre-curing is handled by three specialized 800 W LED-UV ovens. Fibers from each mold group pass through their respective pre-curing unit before entering the principal 6 kW post-curing oven. The system uses adjustable shutters to help contain UV exposure and minimize nitrogen losses. The supplier states a principal wavelength of 395 nm ±3 nm, minimum curing degree of 85%, and post-curing power of no less than 2.5 kW.
Managing Nitrogen Supply And Curing Performance
Operators can manually regulate nitrogen pressure and flow. The system additionally switches nitrogen on when starting and off when shutting down. At production speed under continuous stable conditions, the specified lamp-array power consumption is no more than 80% of total power. These specifications provide a reference for comparing equipment, although testing conditions should be verified with the supplier. Ask whether different adhesives or materials require adjustments to the settings.
Visual Inspection, Capstan Traction, And Take-Up
Visual inspection and consistent winding help preserve fiber quality as material passes through the production line. Buyers can use the listed specifications to assess whether the machine meets the demands of their cable manufacturing process.
Real-Time Inspection Of Fiber Colors And Adhesive Dot Placement
A microscope and camera provide enlarged images in real time. The display allows operators to check the sequence of fiber colors and confirm adhesive resin dots at each dispensing position. This inspection helps identify ribbon problems before the material enters the winding stage.
Precision Take-Up With Servo-Controlled Traction
The Φ190 mm capstan traction wheel is driven by a 1 kW AC servo motor. The listed measurement accuracy exceeds 1‰. Operators can set tension between 50 and 500 g while maintaining an accuracy of ±5 g. Together, these settings support controlled movement and handling of the fiber ribbon.
The specified take-up speed is 600 m/min, and the maximum spool weight is 30 kg. The servo-driven take-up and traversing assemblies support uniform positioning during winding. Cable pitch can be adjusted continuously between 1 and 6 mm. A photoelectric sensor monitors position and assists with reversing direction. Check the intended cable requirements and actual operating conditions with the manufacturer.
Production Monitoring And Electrical Control Systems
Clear control functions help production staff manage settings, monitor system conditions, and prepare smooth stopping procedures. According to the manufacturer, the machinery incorporates Siemens controls alongside Schneider Electric switchgear.
PLC And Touchscreen Operation
Siemens S7-1200 and S7-1500 PLCs manage the ribbon manufacturing system through a 10.4-inch Siemens touchscreen. Schneider Electric provides the low-voltage switching equipment. The system supports both interlocked operation across the full production line and separate operation of individual units.
Settings, Alarms, And Length-Based Stops
Through the touchscreen, operators can manage process settings, activate curing ovens, configure wire feeding, and view alarms. It also displays lamp operating hours, live lamp current, oven temperature, and the equipment’s accumulated operating time. The meter-counter calibration feature allows displayed counts to be aligned with the distance actually traveled.
Operators can program a target production length that triggers deceleration or shutdown. The function supports managed stopping as a cable manufacturing run reaches its planned length. Verify the available controls and configuration requirements with the supplier before purchasing.
| Control feature | Published specification | Use |
|---|---|---|
| PLC and display | Siemens S7-1200 and S7-1500 PLCs with a 10.4-inch touchscreen | Configure settings and examine production data |
| Electrical control components | Schneider Electric low-voltage switchgear | Provides support for system control |
| Monitoring and stopping | Operating data for lamps, ovens, runtime, and meters; preset-length function | Track operating conditions and initiate machine stopping or slowing |
Ribbon Quality, Material Selection, And Process Compatibility
The selected adhesive influences coating uniformity and the quality of the finished ribbon. Rather than recommending a general adhesive, the supplier specifies a formulation dedicated to the equipment’s coating and curing operations.
Dedicated Adhesive For Bonding And Curing
Separate valve switches on the pressurized adhesive supply let operators control individual feed paths. Adhesive flow to each dispensing point is managed using precision pressure-control valves. The specified air pressure is adjustable, with a required minimum of 0.5 MPa.
The adhesive lines are black to reduce the risk of UV-triggered reactions while the system operates and cures material. This protection is important because premature exposure may change adhesive properties before application to the fiber.
Confirm suitable adhesives, process parameters, and surface-finish requirements with the manufacturer before choosing materials for a secondary coating operation. Discuss the material’s expected performance across your planned application and run duration. Clear process instructions can help maintain quality from initial setup through final production.
Installation Requirements And Included Documentation
Ensure the workspace and utility supplies are ready before scheduling the machine’s installation. The supplier’s specifications provide guidance for planning the production site and supporting consistent operation of the fiber-optic machinery.
Facility Conditions And Buyer-Supplied Connections
Install the machinery in a clean, dry, enclosed environment protected from drafts. Maintain a room temperature of 15 to 25°C and relative humidity no higher than 85%. The installation also requires nitrogen supplied at 7 bar with 99.99% purity and an air supply rated at 6 bar.
The equipment package does not include connecting cables or cable trays. The purchaser is responsible for supplying the main incoming power cable. Verify the available utilities and planned cable routes ahead of setup, especially if a secondary coating section is nearby.
Operating Manuals, Drawings, And Maintenance Information
The supplier includes documentation supporting machine installation, operation, and servicing. Inspect the supplied documentation before commissioning so personnel can organize tasks and obtain required materials.
- Operating and instruction manuals together with the overall equipment layout drawing
- Wiring and electrical schematic diagrams, plus installation and maintenance drawings
- Purchased-component instructions and a wear-parts list to support service preparation
The supplied records support preparation for commissioning and routine servicing of the cable production machinery.
Selecting A Ribbon Production Line That Matches Your Manufacturing Requirements
Begin by identifying the ribbon formats you intend to manufacture and sell. The machinery supports 12F and 16F formats and has a stated construction speed of 600 m/min. Compare those specifications with your expected product mix, production targets, and anticipated cable demand.
Verify take-up reel compatibility before placing an equipment order. The standard IBR reel has dimensions of Φ410 × Φ50.8 × 390 × Φ310 mm, supports up to 30 kg, and provides cable pitch adjustment from 1 to 6 mm. Confirm that the listed reel dimensions, capacity, and pitch range are appropriate for your site and handling process.
The compatibility of payoff spools should be reviewed as well. Available options include international-standard spools accommodating 25.2 km, 50.4 km, and 63 km. Obtain the exact spool dimensions before ordering materials or planning the length of manufacturing runs.
Evaluate utilities, adhesive requirements, and operator-monitoring capabilities alongside production speed. For cable manufacturing, determine whether the configuration suits fiber cable, loose tube, or another planned application. Discuss machine configuration and commissioning arrangements with Shanghai Weiye before committing to the purchase. Checking equipment suitability in advance can reduce the likelihood of costly changes after purchase.
| Production planning consideration | Listed detail | Buyer check |
|---|---|---|
| Formats and speed | 12F and 16F formats; 600 m/min | Compare with target production and product mix |
| Take-up | Maximum 30 kg; cable pitch of 1 to 6 mm | Check reel compatibility and facility requirements |
| Fiber payoff reel options | Capacities of 25.2 km, 50.4 km, and 63 km | Verify exact spool dimensions |
Request A Quote For The Intermittent Bonded Ribbon Production Line
U.S. buyers can evaluate a system offering 12F and 16F formats, a specified construction rate of 600 m/min, and specialized optical fiber ribbon-forming equipment. Use these specifications to determine whether the machine is appropriate for your intended cable application.
A pricing inquiry should include your chosen format, projected production quantity, reel requirements, and facility utility details. Also describe the fiber type and handling requirements so Shanghai Weiye can evaluate the proposed configuration.
Confirm the suitability of the adhesive, the LED wavelength specification of 395 nm ±3 nm, and expected curing results before purchasing. Discuss how the stated specifications affect your intended material and finished surface-quality objectives.
Use the manufacturer’s product listing to examine the equipment information. Verify the final configuration, shipment details, and installation commissioning with Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. The supplier provides its address as 201 Minyi Road, Songjiang District, Shanghai. Telephone 021-60701630 to discuss your manufacturing requirements. Providing complete information in your quote request makes the following stages easier to clarify.